euro verbau EG PV 4000 Podręcznik - Strona 3
Przeglądaj online lub pobierz pdf Podręcznik dla Sprzęt budowlany euro verbau EG PV 4000. euro verbau EG PV 4000 4 stron. Corner slide rail system
M NU L
CORNER SLIDE RAIL SYSTEM
Excavation with outside walert and foot rest (lost)
Image 2a
5. Installation
a) Depending on the soil conditions, create an advance excavation for the pit. Set up one plate and se-
cure it against falling over or hold it in position with a second machine
b) Thread one corner slide rail at one end of the plate, into the outer guide, push in with the excavator
and secure it. Insert one plate at right angles to the first plate.
c) Thread the second corner slide rail into the outer guide, push in with the excavator to secure it.
d) Repeat steps C and D on the other side. Make sure that the two plates are at right angles to the head
plate. Insert 2 corner rails on the free plate ends and press them down.
e) Insert one plate into the outer guides of the corner rails. Align the pit system. Lower the plates and
corner rails gradually. At a depth of approx. 2.3 m, affix a support plate to the EG corner, secure it with
bolts and gradually lower it. Max. depth 3.7 m. If necessary, use protection rails and a protection anvil.
On the DG corner, the additional plates in the inner guide are built into the DG corner. At greater
depths, a top plate can also be used in the outer guide. The maximum depth is 6.1m. The plates should
lead ahead of the corner slide rails so that the guides of the slide rail remain free.
EG-CORNER / DG-CORNER
Image 2b
a)
d)
rench shoring equipment
Production - Sales - Rental - Service
Image 2c
b)
e)
c)
e)
3