BobsCNC E3 Skrócona instrukcja obsługi - Strona 2

Przeglądaj online lub pobierz pdf Skrócona instrukcja obsługi dla Grawer BobsCNC E3. BobsCNC E3 3 stron. Cnc router engraver bearing and rail dust kit
Również dla BobsCNC E3: Instrukcja rozwiązywania problemów (16 strony), Podręcznik (8 strony)

BobsCNC E3 Skrócona instrukcja obsługi
Now repeat the above step for the left side x-axis parts starting with the letters FLX. When completed with the front left
x-axis, the front x-axis is complete. Proceed to the rear x-axis assemble, next page.
Rear Screw
Mounting Hole
cable tie just above the bearing carefully, not to cut the wires on the back. Then remove the 4mm X 10mm screw just
above and left of the bearing. For the rear parts assembly you will only use one (1) 4mm X 30mm screw with locking
washer and flat washer through the top hole. Assemble the parts in this order: place the locking washer and flat washer
on the screw, then through the top hole of RRX1, then through RRX2 felt pad, then RRX3, and then install assembly
above the bearing and screw into the existing nut. Adjust the felt pad so that it touches the bearing and rail. Then
lightly tighten the screw. Make sure the felt pad is touching the bearing and rails. Take a cable tie and route it through
the top of the two holes through all parts and on the mainframe over the wires on the back and back through the
bottom of the hole, then tighten the cable tie and then the screw. This now completes the right rear X axis assembly,
repeat the above steps for the left rear axis using the parts starting with RLX. See Photo 7 for what the assembly should
look like when installed as looking at the bearing.
Once installed, they will brush clean both the bearing and rails while the X axis moves, keeping both clean. Once every
few projects are completed on your CNC, best to blow air over the felt pads, so the dust will not clog them over time.
This completes the X-axis.
Cut Cable Tie
being careful
not to cut wires
on other side
Front Assembly
Photo 6
Mounted.
Rear X-axis' Assembly
Now we will start the rear right of the X-axis (see
Photo 6) for the top bearings and rods using Rear X
parts, refer to photo 5. First cut and remove the
Install
Cable Tie
Here
Page 2 of 3
FLX4
FLX3
FLX2
Photo 5
Left Front X Axis Final
Assembly
Bearing Side View
RX1
Photo 7
Rear X axis
Installed
RRX3
RRX2
FLX1