Da-Lite 29526 Instrukcja obsługi - Strona 7
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Ekran projekcyjny Da-Lite 29526. Da-Lite 29526 14 stron.
Installation (continued)
5. Using the other 4" piece of trim (C) as a guide, secure the
opposite end of the T-track (B) section on the end hole with a
#10 screw. Once both ends are attached, slide the 4" trim (C)
pieces along the track to align the other positions and attach
a #10 screw into the hole openings until completed (See
Figure 2).
NOTE: Sliding the trim along the T-track (B) will maintain the
proper alignment when attaching the T-track (B) to the wall.
This alignment is necessary to allow the trim to snap on
easily at the end of the screen installation. Ensure the
opening is level on all four sides. If the opening is not level,
the T-track (B) will need to be shimmed in order to ensure the
screen trim is level once attached to the T-track (B).
#10 Screw
4" Trim
Piece
T-track
Step 4
Step 5
Figure 2
6. Repeat Steps 4 and 5 until all T-track (B) sections have been
secured to the wall opening (See Figure 3). For top and
bottom sections, use 4" piece of trim (C) to overlap at the
seams as a guide to ensure that both T-track (B) pieces are
flush with each other in the wall opening.
Figure 3
7