American Telecom SL PTG012 Instrukcje instalacji - Strona 3

Przeglądaj online lub pobierz pdf Instrukcje instalacji dla Ładowarka American Telecom SL PTG012. American Telecom SL PTG012 5 stron. Telephone and charging station

3. Attach each PTQ365 charger to the housing using two (2) nylon spacers (p/n
180100-00) under the charger, and two (2) #6-19 screws (p/n 180012-00) per
charger.
4. Plug a power supply jack into each charger.
5. Plug in the AC power cord to turn power on. Verify that each charger LED is lit
solid red.
6. Place a SPECTRALINK battery into each charger position.
Verify that each charger LED is lit solid green.
Battery
Enclosure Installation
The SL PTG012 SpectraLink Phone and Charging station can be placed on a table or can
be wall mounted. When wall mounted, the enclosure can be mounted horizontally or
vertically, using a Philips screwdriver and the included mounting hardware. To mount the
SL PTG012 Station to the wall, install the enclosure as follows:
1. Locate the four screws and anchors supplied with the kit.
SL PTG012 Installation Instructions
AMERI*CAN TELECOM INC.
Technical Document
PTQ365
LED
Page 3