Dontek PWP2 Ioniser Instrukcja obsługi - Strona 2
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Systemy filtracji wody Dontek PWP2 Ioniser. Dontek PWP2 Ioniser 7 stron.
INSTALLATION INSTRUCTIONS
CONTROLLER MOUNTING
Find a suitable location to mount the
control box. As with all pool equipment, it
should be installed out of direct weather
and no closer than 3 meters from the
water's edge and a minimum 600mm of
the ground. Lift up the two mounting tabs
and use two appropriate screws to mount
the control box to the wall, keeping in
mind that the power cable is 1.8m long
and should be plugged directly into a
general power outlet, not into an
extension lead. Note that direct sunlight
will fade the display over a period of time.
Connect the pump to the 240VAC outlet at
the bottom of the pwp2 and connect the
cell housing leads to the cell housing
wing-nuts, polarity is not important. The
cell housing is to be plumbed after any
heating equipment and with the cell
house openings facing the ground.
TECHNICAL
Input - 240VAC 50Hz 10A 2400 Watt
Output – 240 VAC 9.98A 2395 Watt
Electrical
Approval
ESO120422
Approval Standards – AS/NZS3136:2001
Including Amendments 1&2, AS/NZS
61000.6.3:2012 (EMC) Part 6.3
APVMA Approval Number 61279
PWP2_Instructions_rA1.docx
Certificate
–
ELECTRODE REPLACEMENT
When the electrodes erode to about
10mm in diameter it is time to replace
them. Turn the power off to the PWP-2,
undo the two electrode cable wing nuts,
close any appropriate valves if the
electrode housing is below water level
then unscrew the large retaining nut on
the side of the housing. Gently prize the
black electrode carrier from the housing
then undo the two brass electrode
retaining nuts, use a cloth or gloves to
handle spent electrodes. Fit replacement
electrodes ensuring that two of the flat
surfaces are parallel to one another and
the brown silicon gaskets are located in
the carrier correctly, fit washers and
tightening nuts firmly. Align the carrier
locator and fit into the housing then
tighten lock nut. Open any closed valves
and switch on power – check for leaks and
tighten as required.
2