Astor-Bannerman ABW-CP Instrukcja instalacji i obsługi - Strona 5
Przeglądaj online lub pobierz pdf Instrukcja instalacji i obsługi dla Spryskiwacz Astor-Bannerman ABW-CP. Astor-Bannerman ABW-CP 13 stron.
Pre-installation information
Fig 4
Plumbing:
Fit cold
(on left)
and hot
(on
right) outlets with their centres at 200mm above the floor, pointing
upwards, offset to the left of the centreline of the unit by 140mm terminating with 3/4" BSP
washing machine isolation valves. These feeds will be enclosed by 50x75mm trunking upon
installation. Fit a 32mm/1¼" waste pipe with its centre at 200mm above the floor, on the centreline
of the unit.
Electrics:
The ABW-CP is supplied by mains electric (30v) and transformed to 4v within the unit. A 30mA
RCD protected fused spur is required, with a flush mounted flex outlet cover, on the wall behind the
unit at a height of 1100mm from the floor on the centreline of the unit.
Fixing:
The basin assembly should be fixed to a load bearing wall (i.e. strong enough to carry a 100kg load
on wall fixing) which is flat and free from obstruction from 200mm – 2200mm above the floor. If
the basin needs to be fixed to a stud wall, the wall will need special reinforcement, either
150mm/6" noggins as shown above or 25mm/1" marine or exterior plywood may be used to cover
the entire fixing area, secured to the stud work every 200mm.
Page: 5
Version 4 : 25-09-019