Astor-Bannerman ABW-CP Instrukcja instalacji i obsługi - Strona 9

Przeglądaj online lub pobierz pdf Instrukcja instalacji i obsługi dla Spryskiwacz Astor-Bannerman ABW-CP. Astor-Bannerman ABW-CP 13 stron.

Astor-Bannerman ABW-CP Instrukcja instalacji i obsługi
Fit the mains water supply:
• Ensure both the hot and cold mains water supplies have been flushed and only then
fit the open ends of the supply hoses with the filter screens supplied onto the
isolation valves
• Thread the free end of the supply hoses up through the trunking and through the
recess in the bottom left hand side of the carcass of the rise and fall unit. The hot
and cold outlets, isolation valve and connecting part of the hose above the isolation
valve must be enclosed within the body of the trunking
• Connect the end of the supply hoses with the Conex fitting to the straight tap
connector already fitted
• Fit the tap body to the base - see page 10 of tap manufacturer's instructions, step 4
only - DO NOT TURN ON THE WATER SUPPLIES YET
Fig 10
Fit the white plastic lower and upper covers and waste assembly:
• Remove & retain the mushroom heads from the four plastic rivets found in the packing
kit
• Fit the lower cover and align the holes in the cover with the holes in the chassis (see
Fig 12 for locations)
• Fit the rivet bodies through the four holes in the lower cover and into the four holes in
the chassis (see Fig 10)
• Push one of the retained rivet mushroom heads onto each rivet body; this will require a
firm push, it is fully seated once the base of the head is flush with the cover
(cont'd on next page)
Page: 9
Version 4 : 25-09-019