Amerisolar Wolfram-BAT-5.12 Instrukcja instalacji - Strona 14
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Sprzęt sieciowy Amerisolar Wolfram-BAT-5.12. Amerisolar Wolfram-BAT-5.12 15 stron.
Worldwide Energy and Manufacturing USA Co., Limited
Before disconnecting the cable from the battery, make sure the battery is turned off.
Shutdown steps:
•Press and hold the red soft start button for 3 seconds, all the indicators on the panel will be
on;
•Release the red button and the indicator light goes out;
•Turn off the power button again;
•If multiple units are used in parallel, after the battery connected to the load or inverter is shut
down, the other batteries will shut down automatically. There is no need to turn on one by one,
but the power button still needs to be turned off manually.
6 Maintenance
•Battery maintenance must be performed by professionals;
•If the battery is stored continuously for more than three months, it must be fully charged
once;
•Every three months, check whether the connections of battery communication and power
cables are loose.
7 Troubleshooting
Troubleshooting can only be performed by professionals. Before checking for faults, you must
check whether all cable connections and circuit breakers are in the correct state.
Serial
Malfunction
Number
Communication
1
failure
2
Unable to boot
3
SOC abnormal
8 Interpretation of Abbreviated Words
FPC
Table 5. common faults
Check whether the communication line is
loose, and check whether the BMS
communication protocol matches the load or
inverter.
Use a charging device to charge the battery. If
it still cannot be turned on, please contact for
maintenance.
Turn off the soft start switch when shutting
down, and then turn off the power switch
after 1 second.
Flexible printed circuit
12
Solution