DAB ESY I/O Instrukcja instalacji i konserwacji - Strona 5

Przeglądaj online lub pobierz pdf Instrukcja instalacji i konserwacji dla Jednostka sterująca DAB ESY I/O. DAB ESY I/O 16 stron.

DAB ESY I/O Instrukcja instalacji i konserwacji
Safety
Use is allowed only if the electric system is in possession of safety precautions in accordance with the regulations in force in
the country where the product is installed (for Italy CEI 64/2).
The power supply cable must never be used to carry or shift the device.
Never pull on the cable to detach the plug from the socket.
Failure to observe the warnings may create situations of risk for persons or property and will void the product guarantee.
Particular warnings
Always switch off the mains power supply before working on the electrical or mechanical part of the system. Before
opening the equipment, wait at least five minutes after disconnecting it from the power supply. Only firmly cabled
mains connections are admissible.

1. GENERAL

ESY I/O is designed to provide the Esyline range of products with optoisolated inputs and outputs, access via BMS systems via MODBUS RTU
Rs485, remote pressure sensor.
ESY I/O is configured and updated via the DConnect APP.

1.1 Content of the pack

ESY I/O
-
Quick Guide.
-

1.2 Applications

Esy I/O allows the following applications:
connection to BMS (Build Management Systems) equipped withRS485 MODBUS RTU interface
Connection with clean contact inputs (e.g. floats)
Output connection, (e.g. sirens)
Connection of remote pressure sensor, to compensate for pressure losses

2. INSTALLATION

For the first installation, if wall mounting is necessary, proceed as described below:
1. Remove the front panel by unscrewing the 4
retaining screws with a straight tip
screwdriver.
ENGLISH
2.
Drill holes in the wall and insert
fixtures aligned with the panel
columns
14
3.
Remove the clips for tightening the plastic
screws of the panel