Ameristar TransPort II Instrukcja obsługi - Strona 3

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Ogrodzenia i bramy Ameristar TransPort II. Ameristar TransPort II 8 stron. Ornamental cantilever gate

3.
For gate openings greater than 24 feet, tracks are required to be spliced. Align short left track (A1) to long right
track (A2) and insert splice block as shown in Figure 2A. Line up pre-drilled holes, attach with frame bolts (E1),
splice bolts (E2), flat washers (J), and frame nuts (H). Tighten all nuts thoroughly. Align long left track (A3) to
short right track (A4) and insert splice block as shown in Figure 2B. Line up pre-drilled holes, attach with frame
bolts (E1), splice bolts (E2), flat washers (J), and frame nuts (H). Tighten all nuts thoroughly.
A1
4.
Position top and bottom tracks parallel to each other. Allow sufficient space to layout uprights between and
perpendicular to tracks (see Figure 3). Use diagram in Appendix 1 (Page 6) to ensure correct location and ori-
entation of each upright. Slide uprights into top track and align with pre-drilled holes. Attach with frame bolts
(E), flat washers (J), and frame nuts (H). Finger tighten. Bring bottom track over bottom of uprights and align
with pre-drilled holes. Attach with frame bolts (E), flat washers (J), and frame nuts (H). Finger tighten.
|
888-333-3422
3
AMERISTARFENCE.COM
PART # TP-II INST | 10/2013
A2
Figure 2A
A3
Figure 3
A4
Figure 2B
3