DoorHan SECTIONAL-750PRO Instrukcja instalacji i obsługi - Strona 6
Przeglądaj online lub pobierz pdf Instrukcja instalacji i obsługi dla Otwieracz do bram DoorHan SECTIONAL-750PRO. DoorHan SECTIONAL-750PRO 18 stron. Operator
4. OPERATOR INSTALLATION
4.1. TOOLS
1.
Set of spanners
2.
Set of slotted and cross screwdrivers
3.
Set of drills for metal
4.2. REQUIRMENTS TO DOOR INSTALLATION
P rior to installation check if the door is
properly balanced and moves smoothly when
automatically operated.
M ake sure, that minimal clearance between
the ceiling and the top point, when the door is
moving, is not less than 45 mm (pic. 1).
C heck, that the door leaf top roller is in the
horizontal part of the guide rail, when the door
is completely closed (pic. 2).
M ount the door control panel at a height not less
than 1.5 m close to the door.
4.3. CONNECTION OF OPERATOR AND GUIDE
1. Put the operator bushing (4) on the shaft (5).
2. I nsert the operator unit into the hole on the
guide (3).
3. F asten the operator with U-brackets (2) and
tapping screws (1).
1.
2.
3.
4.
5.
6
4.
Set of drills for concrete
5.
Pliers
6.
Hacksaw for metal
Tapping screws
U-bracket
Guide
Bushing
Motor shaft
7.
Electric drill
8.
Tape measure (folding rule)
45 mm
Pic. 1
OPERATOR INSTALLATION
Pic. 2
1
2
3
4
5