Astrea Evolve AA20CRK Instrukcja wymiany - Strona 14

Przeglądaj online lub pobierz pdf Instrukcja wymiany dla Urządzenia przemysłowe Astrea Evolve AA20CRK. Astrea Evolve AA20CRK 19 stron. Wetted flow path for 200mm and 250mm chromatography columns

Adjuster Assembly

1. Install to antijet in the flowcell by carefully locating the 3 pins into the ribbed face of the
flowcell.
2. Install the adjuster mesh by carefully locating the bed support seal into its location
groove in the side of the adjuster cell. Ensure the seal is pushed tight into the groove.
The bed support should be fitted with the smooth side facing into the column. (Rougher
side to flowcell). See figure below.
Bed Support
Seal

Figure 1.10 Diagram showing the location of the adjuster bed support

Figure 1.11 Photograph showing the location of the adjuster bed support

3. Push the adjuster seal onto the seal setting ring. Ensure that the seal is correctly located
by checking it is located in the groove in the setting ring.
4. Fit the flowtube seal into the adjuster flowcell and replace the flowtube. Use the correctly
sized spanner to tighten.
5. Locate the flowtube within the stainless steel central seal setting tube and replace the
flowcell locking clip.
Rough Side
Smooth Side
13
Flowcell
Bed Support