Canyon 2 TIER SHOE CABINET Instrukcja montażu - Strona 16
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Wyposażenie wnętrz Canyon 2 TIER SHOE CABINET. Canyon 2 TIER SHOE CABINET 18 stron.

CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS
x2 SETS
24
23
iii.
CLAMP BASE PANEL (23) AND
OUTER PARTITION (24) TO THE
SWIVELS USING SCREWS (H).
CAREFULLY INSERT THE LOWER
ASSEMBLED CARRIAGE INTO
POSITION BETWEEN THE SIDE
PANELS, INSERT PIVOT PINS (S) AND
USING SCREWS (J) FIX INTO PLACE,
DO NOT OVERTIGHTEN THE SCREWS.
THE CARRIAGE MUST BE KEPT LEVEL
WHEN DOING THIS TASK SO PLEASE
SEEK HELP FROM YOUR ASSISTANT.
REPEAT FOR UPPER CARRIAGE.
STEP 19
i.
Q
ii.
GENTLY LEAN SWIVELS (P&Q) OUTWARDS
AND SLIDE THE BASE (23) INTO THE GUIDES.
SLIDE IN THE OUTER PARTITION (24) AND
MAKE SURE THE PANELS ARE SITTING
EVENLY IN EACH GROOVE, CAREFULLY
TIGHTEN THE SIX SCREWS (H) 100%
H
H
S
J
x4
Version 1 - 210821
Page 16 of 18
LOOSELY FIT THE SWIVELS (P&Q)
TO EACH SIDE OF THE FLAP (22) USING
SCREWS (H).
DO NOT TIGHTEN SCREWS 100% YET.
22
STEP 20
For this step:
Tools required
Hx6
P
Fittings required
H x20
P x2
H
Q x2
H
For this step:
Tools required
Fittings required
J x4
S x4