Douglas F5 FIXED Series Instrukcja montażu i instrukcja obsługi - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja montażu i instrukcja obsługi dla Sport i rekreacja Douglas F5 FIXED Series. Douglas F5 FIXED Series 8 stron. Fixed height basketball system
Również dla Douglas F5 FIXED Series: Instrukcja montażu (6 strony)

One, free easy call gets your utility lines marked
AND helps protect you from injury and expense
NOTE: At rim height 10' , distance from the face of backboard to the
front of Main Post(A) is 48", Choose the proper location to dig
for the concrete footing:
STEP A
a. Dig a hole 48" deep and 20"x 20"square . The edge of the hole
should be flush with the edge of the playing surface. If you live in an area
where heavy frost can occur, it may pose a problem, consult your local
building inspector to determine the appropriate hole depth.
NOTE: The hole must be at least 48" deep.
b. Build a form before pouring the concrete pad, to ensure that the top
of the concrete remains straight and square. The form should
be placed about 1/2" above the playing surface to allow for water drainage.
c. Bell out the bottom of the hole.
NOTE: A square hole prevents the rotation of the concrete.
NOTE: The area behind the playing surface must be cleared off by at least
3 feet to enable the user to stand behind the pole to adjust the Rim height.
STEP B
A. Thread a 16mm Hex Nut (U4) onto each of the 16mm J-Bolts
(U2).Securely tighten the Nuts all the way down to the end of the
threads.
B. Slide the threaded end of the J-Bolts through the holes
in the Anchor Template (U1) and secure each J-Bolt with a
16mm J-Bolt Hex Nuts(U4) as shown. Securely tighten all Nuts
at this time.
NOTE: Make sure the curved"J"ends of the J-Bolts are
oriented in a rectangular pattern, as shown.
U2
4
U4
Utility Markings
Color
De nition
Red
Electric
Yellow
Gas, Oil, Petroleum
Orange
Communication, Phone, TV
Blue
Portable Water, Irrigation
Green/Brown
Sewer
White
Proposed Dig
20"
U4
U4
U1
U2
U2
20"SQ
48"
U4
U4
U2
U2