COMAC i.BLAST Series Instrukcja instalacji
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Suszarka COMAC i.BLAST Series. COMAC i.BLAST Series 2 stron.

i.B L A S T series
Installation must be performed by qualified personnel.
Hand dryer must be grounded.
· Remove the two tamper-proof cover attachment screws using the
supplied key. Tilt the cover outward and unhook at the top.
· Use the chart below to determine the correct height of the base-
plate. When two or more dryers are installed, they should be placed
no closer than 60cm (24") between centers. Mark the location of the
four mounting holes.
· All dryers must be fed by two power conductors and one ground
wire. For wall wiring, carry the electrical wire to the dryer and attach
it to the baseplate knockout using an approved connector.
· Attach the baseplate firmly to the wall. For wood walls or wood
studs, use minimumb No. 12 screws of proper length to ensure
25mm (1") minimum stud penetration. For masonry walls use
expansion bolts or anchors for 6mm (1/4") screws of proper length
to ensure penetration 6mm (1/4") deeper than anchor. Shim if
necessary to ensure that the baseplate is level and flat against the
wall.
· For surface wiring, remove the knockouts from the dryer inlet grill
and the outlet grill bracket and bring the conduit to the dryer from
below. Attach the conduit to the outlet grill bracket using an
approved connector.
· Connect the two power leads to the terminal block on the circuit
board. Tug gently on the wires to ensure that they are held tightly.
C
US
DIMENSIONS
Steel - 9-1/8" - 232mm
Distance from bottom edge of dryer to floor:
Men
. . . . . . . . . . . . . . . . . . 47 in . . . . 119 cm
Women
. . . . . . . . . . . . . . . . . . 44 in . . . . 112 cm
Children 8-10 years
Children 11-13 years
Children 14-16 years
ADA Compliant. . . . . . . . . . . . . . . . . 36 in . . . . . 91 cm
6 ¾" - 172mm
. . . . . . . . . . 35 in . . . . . 89 cm
. . . . . . . . . . 38 in
. . . . . 97cm
. . . . . . . . . . 44 in . . . . 112 cm
Attach the ground wire securely to the ground screw on the
wallplate.
· Replace the dryer cover. Hook the cover onto the two cap screws
at the top and pivot the bottom of the cover over the metal tabs on
the inlet grill. Replace the two tamper-proof screws, taking care not
to cross-thread or over-tighten them.
· IMPORTANT: After turning on electrical power, wait 5 seconds
before attempting to operate dryer.
Cleaning & Maintenance
- Regularly clean exterior surfaces and wash with mild soap.
- Remove accumulated dust from air inlet areas.
- Ensure that infrared sensor lens is clean and unobstructed.
Once per year, or more frequently if dryer is installed in a
dusty, greasy, or heavy use environment:
- IMPORTANT: Turn off the breaker at electrical panel or source.
- Remove cover.
- Remove accumulated dust from mechanism.
- Replace cover and restore power.
IMPORTANT: It takes up to 3 minutes after power-on till hand dryer
be ready to operate. When device turns on, it tries to connect to the
network for two times and each times it takes up to 90 seconds. If
device is not able to connect to the network , the modem turns off
and device works as a standard hand dryer
2-25 boul. Maisonneuve, St-Jérôme, Québec J5L 0A1 Canada
Tel: 1(855) 550-0303 Tel: 1(450)432-5946 Fax. 1 (450) 432-8910
www.comaccorporation.com
INSTALLATION
Replacement Parts
1
Baseplate
2
Motor Assembly
3
Heating Element
4
Inlet Grill
5
Element Housing
6
Circuit Board
7
Outlet Grill
8
Sensor
9
Nozzle
10
Nameplate
11
Cover
12
Fasteners
13
Sensor Mounting Plate
14
Sim Card
12
15
Antenna