Douglas Dynamics Fisher Minute Mount 2 XLS 50600 Instrukcja instalacji - Strona 10
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Akcesoria samochodowe Douglas Dynamics Fisher Minute Mount 2 XLS 50600. Douglas Dynamics Fisher Minute Mount 2 XLS 50600 17 stron. Snowplow
50600, 50810
LIFT CHAIN AND CABLE
1. Complete the installation of the lift chain by
inserting the loose end of the lift chain through the
stop link on the lift arm. Fasten to opposite holes
in the A-frame brace using a 3/8" U-bolt, lock
washers and nuts. Hand tighten.
2. Insert the cable down through the hole in the strap
fork. Attach the strap fork to the hole in the stop
link on the lift arm with a 3/8" x 1" clevis pin and
1/8" x 1" cotter pin. Slip the cable thimble onto the
top loop in the spring previously installed in the
front of the A-frame.
NOTE: The slotted end of the thimble may need to
be opened to slip it onto the loop. Fully close the
slot after attaching the thimble to the spring.
3. Loop the end of the cable around the thimble. Pull
the cable up against the thimble until the slack is
removed. Attach the end of the cable back onto
itself with two cable clamps loosely installed close
to the thimble as shown.
Due to varying vehicle heights, the length of the
cable must be adjusted for the vehicle in the Final
Adjustments section at the end of these instructions.
Lit. No. 50579, Rev. 02
HEADLAMPS
Headlamps, hardware and instructions are found in
the headlamp box.
1. Attach the headlamps to the hole and slot in the
2. Secure the snowplow harnesses and cables to the
Stop Link
Clevis
Pin
Cable Boot
Cotter Pin
Cable Ties
Strap Fork
Cable
Snowplow
Lighting
Harness
3. Install the cable boot onto the headgear bracket.
10
WARNING
Your vehicle must be equipped with snowplow
headlamps and directional lights.
headgear light bracket by following the instructions
included with the headlamps.
headgear as shown.
Cable Ties
Snowplow
Battery
Cable
Cable
Tie
April 15, 2010