Dover Ebsray R75 Instrukcja instalacji, obsługi i konserwacji - Strona 2
Przeglądaj online lub pobierz pdf Instrukcja instalacji, obsługi i konserwacji dla Pompa wodna Dover Ebsray R75. Dover Ebsray R75 12 stron. Regenerative turbine pump
3.
The materials and method of fabrication of any required
sub-systems.
It is the responsibility of the designer, fabricator and the installer
of each required sub-system to ensure that:
a)
The Ebsray specifications within this publication and any
other relevant Ebsray documents are STRICTLY
adhered to.
b)
Any variation (including the use of equipment deemed
"Equivalent") or addition to Ebsray specifications, as
related to the pumpset and pumping system in general,
meet Ebsray's minimum requirements.
Failure to set the vehicle emergency
brake and chock wheels before
performing service can cause severe
personal injury or property damage
Hazardous
machinery can
cause serious
personal injury.
Failure to disconnect and lockout
electrical power or engine drive before
attempting maintenance can cause
severe personal injury or death
Hazardous
machinery can
cause serious
personal injury.
Disconnecting fluid or pressure
containment components during pump
operation can cause serious personal
injury or property damage.
Hazardous pressure
can cause serious
personal injury or
property damage
2.1
PUMP IDENTIFICATION
A pump identification tag, containing the pump serial
number, I.D. number, and model designation, is attached to
each pump. It is recommended that the data from this tag
be recorded in SECTION 2.3. If replacement parts are
needed, or if information pertaining to the pump is required,
this data must be furnished to an Ebsray representative.
The R75 pump is listed by Underwriters' Laboratories for
liquefied petroleum gas service.
2.2
TECHNICAL DATA
Maximum Operating
Temperature
Maximum Pump Speed
Maximum Differential
Pressure
Maximum Working
Pressure
SECTION 2 - PUMP DATA
135°C (275°F)
3450 RPM
1400 kPa (14 Bar)
2920 kPa (29.2 Bar)
c)
All design, fabrication and installation of the tank and sub-
systems is STRICTLY in accordance with all relevant
National, State and Local Directives, Standards, Codes and
Regulations.
d)
All equipment is suitable for the hazardous area as defined
by EN6079.10.1
All Essential Health and Safety Requirements (EHSR's) as
e)
outlined in EN60079.14, EN15198, EN ISO 80079-36 and
EN ISO 80079-37 are adhered to.
This product is CE marked (meaning the equipment has been
assessed and supplied in conformity to those Directives), strict
adherence with all instructions and recommendations forms an
essential part in maintaining the product/equipment's conformity.
Failure to comply with the instructions and recommendations
contained in this Publication may void CE conformity.
Failure to relieve system pressure prior
to performing pump service can cause
serious personal injury or property
damage. Systems with meters will still be
pressurized even after the hose is
Hazardous pressure
emptied
can cause serious
personal injury or
property damage
Operation without guards in place can
cause serious personal injury, major
property damage, or death.
Do not operate
without guard
in place
Technical Data is for standard materials of construction.
Consult Ebsray Material Specs for optional materials of
construction.
2.3
INITIAL PUMP START UP INFORMATION
Model No.
Serial No.
Equipment No.
Date of
Installation
Inlet Gauge
Reading
Discharge
Gauge Reading
Flow Rate
2