Dover TWG 250PR Instrukcja obsługi i naprawy - Strona 11
Przeglądaj online lub pobierz pdf Instrukcja obsługi i naprawy dla Urządzenia przemysłowe Dover TWG 250PR. Dover TWG 250PR 19 stron.
18. Carefully place brake housing assembly onto the piston ensuring to orient the motor mount
bolts and all ports properly. Ensure the dowel pin (Item 34) is installed through the brake
housing, brake piston and brake adapter. Tap brake housing down until it makes contact
with the springs.
19. Install the six bolts (Item 26) thru the brake housing into the brake adapter (Item 19) and
evenly tighten the bolts to draw the brake housing down onto the springs to prevent damaging
the O-ring and backup rings on the brake piston.
20. Tighten to spec. See page 15 for Torque Specifications Chart.
47
48
40
22
29
30
27
27
44
45
13
46
29
28
11
19
43
11
25
14