Follett Horizon HMC1000ABT Instrukcja instalacji - Strona 10
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Kostkarka do lodu Follett Horizon
HMC1000ABT. Follett Horizon
HMC1000ABT 16 stron. Ice storage bin top-mount applications
Również dla Follett Horizon
HMC1000ABT: Instrukcja instalacji (16 strony), Instrukcja instalacji (16 strony)
Connect icemaker to louvered docking assembly.
• Plug must be accessible after fi nal installation.
• H_E1400A/W 230/50/1) requires a 20 amp circuit (4.00 mm
Air-cooled icemakers – follow steps 7.1 through 7.4.
7.1
Ice transport tube
➋
• Slide icemaker into louvered docking
➊
assembly
• Insert ice transport tube all the way into
coupling and tighten nut fi rmly
7.3
Power cord
• Remove twist tie
• Carefully pass plug thru opening and plug
into wall outlet
10
CAUTION
2
➊
➋
Internal connections
wire)
7.2
Potable water and drain lines
• Insert potable water line into valve
• Push drain line over hose barb on
back of evaporator mount
7.4
Power cord
• Position plate into opening and secure
with supplied screw.
self-contained
7
➊
➋
➊
➋
➊
➋
BIN • TOP-MOUNT