Follett Horizon HMC1000ABT Instrukcja instalacji - Strona 9
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Kostkarka do lodu Follett Horizon
HMC1000ABT. Follett Horizon
HMC1000ABT 16 stron. Ice storage bin top-mount applications
Również dla Follett Horizon
HMC1000ABT: Instrukcja instalacji (16 strony), Instrukcja instalacji (16 strony)
Connect utilities to louvered docking assembly.
6.1
Air-cooled ice machines only
➋
➊
• Remove access panel if necessary
➊
• Install drain line
.
The rigid drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
• Install ice machine potable water
➋
supply
• Replace access panel
BIN • TOP-MOUNT
self-contained
External connections
6.2
Water-cooled ice machines only
➌
➋
➍
➊
• Remove access panel if necessary
➊.
• Install drain line
The rigid drain line from the ice machine
must have at least 1/4" per foot pitch.
• Connect cooling water supply
➌
return
• Install ice machine potable water
➍
supply
• Replace access panel
6
➋
and
9