Follett Horizon Elite Chewblet H C1410WBS Series Instrukcja instalacji - Strona 12

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Kostkarka do lodu Follett Horizon Elite Chewblet H C1410WBS Series. Follett Horizon Elite Chewblet H C1410WBS Series 16 stron. Ice storage bin

Follett Horizon Elite Chewblet H C1410WBS Series Instrukcja instalacji
Water-cooled ice machines – follow steps 7.6 through 7.12.
7.5
Set TDS switch
• Set the TDS switch on the electrical box:
HIGH: for extended service life
LOW: for low-scale water
7.7
Ice transport tube
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube into coupling and
tighten nut firmly
12
TDS
HIGH
CLEAN
LOW
self-contained
7.6
Cooling lines
• Install ice machine cooling water lines to
docking assembly
7.8
Water solenoid, shut-off valve,
and potable water line options
If water solenoid is already mounted to
evaporator:
• Insert potable water line into shut-off valve.
If this is an undercounter installation:
• Mount water solenoid atop evaporator and
locate the shut-off valve inside the machine.
Insert potable water line into shut-off valve.
If water solenoid is not mounted and
machine will not be installed under-
counter:
• Mount water solenoid to inside rear (upper
right corner) of docking assembly using one
screw.
• Insert potable water line into shut-off valve -
locate the shut-off valve outside the machine.
Insert outgoing line from shut-off valve into
push-in connection of water solenoid.
BIN • RIDE Technology
In
Out