Follett Horizon Elite Chewblet HCD1410RBT Instrukcja instalacji - Strona 10

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Kostkarka do lodu Follett Horizon Elite Chewblet HCD1410RBT. Follett Horizon Elite Chewblet HCD1410RBT 13 stron. For ice storage bin top-mount applications
Również dla Follett Horizon Elite Chewblet HCD1410RBT: Podręcznik (8 strony), Podręcznik (8 strony)

Follett Horizon Elite Chewblet HCD1410RBT Instrukcja instalacji
Connect docking assembly to ice machine.
7.1
Ice transport tube installation
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Refrigeration lines
• Evacuate line set.
• Connect self-sealing liquid and suction
line fittings
10

Internal connections

7.2
Water line
• Insert potable water line into valve
7.4
Power cord
• Remove twist tie
• Carefully pass cord through opening and
plug into wall outlet
remote condensing
7
BIN • TOP-MOUNT