Follett Horizon Elite HCD1810NJS Instrukcja instalacji - Strona 11
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Kostkarka do lodu Follett Horizon Elite HCD1810NJS. Follett Horizon Elite HCD1810NJS 17 stron. Ice machine models with ride technology
Również dla Follett Horizon Elite HCD1810NJS: Skrócona instrukcja obsługi (8 strony), Podręcznik (8 strony)
Connect docking assembly to ice machine.
7.1
Ice transport tube installation
➋
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Refrigeration lines
➊
• Evacuate line set.
• Connect self-sealing liquid and suction
➊
line fittings
DROP-IN • RIDE Technology
➊
➊
➋
remote condensing
Internal connections
7.2
Water line
➊
Mount water
solenoid
• Mount water solenoid to inside rear of
docking assembly using one screw
• Insert potable water line into valve
• Insert into push-in connection of water
solenoid
➌
7.4
Power cord
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
7
➋
➌
➊
➋
11