DQ Cassius Instrukcja instalacji
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Grzałka DQ Cassius. DQ Cassius 10 stron. Vertical radiator
Please unpack your delivery carefully and inspect the radiator and contents –
any damages or shortages must be notified to your supplier within 3 days of
delivery of your goods.
SPECIFICATIONS FOR CASSIUS VERTICAL
PLEASE NOTE: That in accordance with Part L1 2006 of the Building Regulations and BS7593:1992 code of practice for the
treatment of hot water and central heating systems, we recommend flushing the heating system before installation of new
radiators and then adding the correct quantity and type of inhibitor for use with the radiator and system to prevent corrosion.
Damage caused to systems not protected by a suitable inhibitor will not be covered by the manufacturer warranty. It is the
responsibility of the installer to ensure the correct use and suitability of the fixings provided. No liability for costs or damages
arising from failure to do so can be accepted.
Cassius Vertical Radiator Fixing Instructions
Materials
Connections
Test Pressure
Testing Authority
Max operation pressure
Max working temperature 95c
These can be cleaned using a soft damp cloth
with a non-abrasive cleaning product.
Mild Steel
½ "Flow and Return
8 Bar
EN442
4 Bar