Bosch SGE63E15UC/55 Instrukcja instalacji - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Zmywarka Bosch SGE63E15UC/55. Bosch SGE63E15UC/55 37 stron.

Hammer
Hole Saw
Pipe Wrench
Adjustable Wrench
Tape Measure
Slot Screwdriver
Phillips Screwdriver
Torx -[-20 Screwdriver
Wire Cutter
Wire Stripper
O 2 mm (1/16 in) Drill
Level
Electrical Supply Cable - Minimum #14 AWG, 2 conductor,
1
ground, insulated copper conductors rated 75°C or higher
Hot Water Supply Line - Minimum 3/8"O.D. copper tubing or metal
braided dishwasher supply line
Shut-off valve and fittings appropriate for hot water supply line
(copper tubing/compression
fitting, or braided hose)
UL listed conduit connector or strain relief is required if you attach
the field wiring directly to the terminal block