UNIT INSTALLATION
- FIRST THINGS FIRST -
REQUIRED TOOLS
Phillips Screwdriver
5/16" Socket
Head Screwdriver
Measuring Tape
2.25" (57 mm)
or or
Mitre-Box and Saw
PVC Pipe Cutter
10
Regular Screwdriver
Hole Saw
Cutting Pliers
Drill
2" (50 mm)
0.5" (12.5 mm) bit
WHERE TO INSTALL THE UNIT
We recommend installing the system on the lowest level of the building to avoid
having to work against gravity. Dust and solids will fall easier than being pulled
upwards, this is why the basement is generally the most ideal location. If there is no
basement, a storage room is equally suitable.
MINIMUM DIMENSIONS AND SPACING
It is important to install the unit in a location where it will be easily accessible for maintenance
and to effectively evacuate dust. The minimum spacing required is the following :
10''
(25cm)
UNIT INSTALLATION
- FIRST THINGS FIRST -
24'' (60cm)
28'' (70cm)
24'' (60cm)
11