Draper VCB Silhouette E series Instrukcja instalacji i obsługi
Przeglądaj online lub pobierz pdf Instrukcja instalacji i obsługi dla Ekran projekcyjny Draper VCB Silhouette E series. Draper VCB Silhouette E series 5 stron. Electric video conferencing background
220V VCB Silhouette/Series E Electric Video Conferencing Background by Draper
1 Read instructions through completely before proceeding; keep them for
future reference. Follow instructions carefully. Installation contrary to
instructions invalidates warranty. Care in mounting and correct oper-
ation will mean long and satisfactory service from your background.
2 Unit should be accessible for complete removal should background
become damaged or should other service be required.
3 Unit should be installed level (using a carpenter's level).
4 Nothing should be fastened to dowel or background.
5 Operating switch(es) packed separately in carton. Do not discard with
packing material.
6 Unit operates on 220V, 50 hz., 1. ph current.
NOTE: Unit has been thoroughly inspected and tested at factory and found
to be operating properly prior to shipment.
These instructions are meant as a guide only. They do not imply any
responsibility on the part of Draper, Inc. for improper installation or faulty
workmanship at the jobsite.
Installation
Your Draper Video Conferencing Background can be mounted on a wall or
suspended from the ceiling, or mounted on 15 cm or 25-36 cm extension
brackets. Extension brackets must be ordered separately from Draper. With
each method of installation, the case must be mounted level and with the flat
back parallel to the wall.
To reduce the risk of personal injury, use only the hardware which comes with
the unit or is specified in these instructions.
The unit (or wall extension brackets) should be mounted into studs or block-
ing in the wall/ceiling, or in drywall (minimum thickness
anchors. For any other type of installation, follow all local building and safety
codes.
Steel studs, concrete or cinder block walls and all other types of non-wood
frame construction require the use of special screws or anchors. The selection
of appropriate mounting hardware should be made by a qualified professional
installer.
When locating background and checking clearance for operation, remember
background is centered in case.
Take care to install wall/ceiling electrical box and conduit so they will be fully
concealed by the case after installation.
Handle case carefully to avoid scratching.
Regardless of mounting method, unit should be positively and securely sup-
ported so that vibration or even abusive pulling on the background will not
cause case to work loose or fall. Installer must insure that fasteners used are
of adequate strength and suitable for the mounting surface chosen.
Wall Mounting
Mount two, three or four aluminum brackets provided ("Z" Clips) on the wall
at desired height, using appropriate fasteners. Verify that they are in line and
level to fully engage with the mounting lip on back of case. 1
is required above the "Z" Clips to allow case lip to be engaged over the lip of
the "Z" Clips.
Engage the lip on back of case with lip of "Z" Clip and gently pull down to fully
engage case to brackets.
Copyright © 2015 Draper Inc. Form VCBSilhouetteE220V_Inst15 Printed in U.S.A.
Installation/Operating Instructions
Caution
/
") with specified
1
2
/
" of free space
5
8
Lip on back of case
"Z" Clip
(wall mounting bracket
supplied with Silhouette)
Ceiling/Suspended Mounting
Locate two offset ceiling brackets (supplied) and slide these into the channel
on top of case by aligning the chamfered edges of each bracket parallel to
the channel length. Allow bracket to drop against bottom of channel and then
rotate bracket counter-clockwise. Slide one bracket to each end of case until it
stops against end cap of case. Tighten two set screws to lock bracket in place.
Make sure that the flange of the ceiling bracket that has four holes is extended
beyond the end caps of the case. Repeat above procedure for second ceiling
bracket, making sure to slide it towards opposite end of case.
Ceiling bracket in
channel of case
To mount against ceiling, hold case against ceiling and mark mounting hole
locations. Each bracket has two holes towards the front edge and two holes
towards the back edge. Installer must use at least two fasteners per bracket
with one fastener in one of the two holes closest to back edge of bracket, and
one fastener in one of the two hole closest to front edge of bracket. Installer
must insure that fasteners are of adequate strength and suitable for the
mounting surface chosen.
(front of Silhouette case)
To mount suspended from ceiling, the brackets need to be installed on
case as noted above. Use "S" Hooks through the holes in the brackets to
attach to ceiling. Select the set of holes that allows the unit to hang in a verti-
cal position. The installer is to provide the "S" Hooks and the materials and
fasteners to attach the "S" Hooks to the ceiling. Installer must insure that the
fasteners and suspension material is of adequate strength and suitable for the
background chosen.
If you encounter any difficulties installing or servicing your VCB Silhouette, call your
dealer or Draper, Inc., Spiceland, Indiana, (765) 987-7999 or fax (765) 987-7142.
US Patent Nos. 5,296,964; 6,111,694
Silhouette fully engaged
on "Z" Clip
Ceiling bracket
Mounting fasteners
(supplied by others, 2 per bracket)
(right end of Silhouette case)