Draper FlexShade SkyLight 3 Instrukcja instalacji - Strona 4
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Wyposażenie wnętrz Draper FlexShade SkyLight 3. Draper FlexShade SkyLight 3 6 stron.
SkyLight 3 Installation Instructions
Draw Cable Routing
The diagram below shows the proper path of the Draw Cables (see fig 11).
Before Routing Cable - Side View
Shade Fabric
(attached to Hem Bar)
Tensioning Pulley
Draw Cables
Cable Properly Routed- Side View
Shade Fabric
(attached to Hem Bar)
Over
Tensioning
Pulley
Attaching Draw Cables to Hem Bar
Once the Draw Cable has been properly routed it must be attached the Hem Bar
with the appropriate amount of tension.
(1) To ensure proper tension, pull Draw Cable until the end is in line with the
center of the Orange Sticker on the Side Channel. To remove slack from the
Draw Cable, rotate the Roller Assembly down (see fig. 12).
Hem Bar
in Side Channel
Hem Bar
in Side Channel
See Attaching Cable
to Hembar Below
Figure (12)
Draw Cable
Draw Cable
Draw Cable
& Sticker
& Sticker
& Sticker
B Pull Draw Cable until the end is in
line with the center of the Orange
Sticker on the Side Channel
To remove slack from the Draw Cable,
rotate the Roller Assembly Down.
www.draperinc.com
Figure (11)
Sticker
Draw Cables
(one on each side)
(2) Slide the Hem Bar to the Draw Cable and insert the Cable into the Hem Bar
Slot (see fig. 13) Slide the Cable along the Hem Bar Slot, toward the Side
Channel, until it stops. This Draw Cable is now properly tensioned.
(3) Repeat on the opposite side.
(765) 987-7999
4
of
End Bracket
Pulleys
End Bracket
Pulleys
Figure (13)
C Insert Cable in Hem Bar Slot
and slide Cable all the way
to the end.
D Repeat on the opposite side.
6