BCS 65PT Instrukcja obsługi - Strona 3
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Sprzęt do trawników i ogrodów BCS 65PT. BCS 65PT 16 stron.
65PT Pull-Type Compost Topdresser
IMPORTANT SAFETY PRECAUTIONS
CAUTION!!!
OOperator must read before using unit.
1
KEEP HANDS AWAY from any moving parts of the
spreader during operations.
2
NEVER run spreader unless all guards are
securely tightened in proper position.
3
NEVER repair any parts or make any adjustments
while machine is in motion.
4
NEVER wear loose clothing around any moving
parts of the machine.
5
NEVER allow anyone to ride spreader.
6
NEVER operate on slopes.
! ! ! !
Failure to heed the above warnings may result in
personal injury or death.
MAINTENANCE
1
The Model 65PT has a very simple design, with
maintenance-free, sealed bearings in all but three places -
the wheel bearings. These bearings will require lubrication
every 10 hours. Grease zerks are located on the right
wheel hub and below the axle on both sides of the unit.
Maintenance Interval - with each use.
INSTRUCTIONS
2
Always check tire pressure before using the 65PT.
3
Store the 65PT Topdresser Inside for extended service
life.
5
to Adjust Conveyor Belt Tightness, loosen, but DO
NOT REMOVE, the 4 nuts on the slide tighteners on
both sides. Using a ¾O wrench, tighten the adjusting nut
until there is ½O to ¾O play in the center of the conveyor
belt. Always measure each side so the adjustment is
equal on both sides.
6
The End Gate is
Adjustable for
different material
flow rates by simply
using the gate
adjuster handle at
the right front of the
unit. Pull the pin out,
turn the handle to set
the endgate at the
proper height, and
replace the pin.
3
4
Pressure wash the
conveyor rollers
weekly through the
four round holes to
insure longer life of
the conveyor belt.