Bosch Benchmark HBL5751UCC/03 Instrukcja instalacji - Strona 10

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Piekarnik Bosch Benchmark HBL5751UCC/03. Bosch Benchmark HBL5751UCC/03 39 stron. Built-in combination ovens

Bosch Benchmark HBL5751UCC/03 Instrukcja instalacji

Cabinet Dimension Requirements

It is good practice, when an oven is installed at the end of a
cabinet run, adjacent to a perpendicular wall, or cabinet
door, to allow at least 1/4" (6.4 mm) space between the
side of the oven and the wall/door.
For oven support, install 2x4s extending front to back flush
with the bottom and the sides of the opening. The
supporting base must be well secured to the floor/cabinet
and level.
Junction boxes can be located anywhere within reach of
the oven's power cable.
The cabinet base must be flat and capable of supporting
the weight of the combination oven up to 429 lbs. (195 kg).
Combination Oven and Speed
Microwave or Steam Convection Oven
30" Traditional Installation
9001080875 Rev A

Combination Oven and Speed Microwave or

Steam Convection Oven 30" Flush Mount

Installation

Flush installation requires two side cleats to be attached
inside the cabinet frame, recessed from the
front.
English 5