Anchor Venue Series Instrukcja instalacji - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Namiot Anchor Venue Series. Anchor Venue Series 8 stron. Structures
Również dla Anchor Venue Series: Instrukcja instalacji (7 strony)

Step 5 - For Event
Eave cables with turnbuckles are required for liner installation. Slide the Liner Eave Bracket onto the interior side of the
upright. Fasten by tightening screw and eyebolt into upright channels as shown below. Attach quick link and cables as
shown in Figure 5b. See Figure 5c for Gable End Cable attachment. Twist Turnbuckles until cables are taut.
(2) Eyebolts and (1) screw are included
with each bracket. Use two eyebolts
where cables are required in adjacent
bays.
Liner Eave Bracket
Rafter
Gable End Purlin
Gable End Liner Cable
Gable End Cable & Mid
Liner Cable fasten into
same eyebolt on Liner
Eave Bracket.
Gable End Fabric
4
Butt Liner Eave
Bracket up against
purlin bracket.
Rafter
Figure 5a
Eave
Purlin
Upright
Eave
Purlin
Quick link
Liner Eave Bracket
Upright
Figure 5c
Mid Liner Cable
Figure 5b
Turnbuckle
Turnbuckle
Quick Link
Figure 5d