Carlson Surveyor+ Skrócona instrukcja obsługi - Strona 3
Przeglądaj online lub pobierz pdf Skrócona instrukcja obsługi dla Rejestratory danych Carlson Surveyor+. Carlson Surveyor+ 7 stron. Gps system
![Carlson Surveyor+ Skrócona instrukcja obsługi](/uploads/products/server2/1403748/1403748.jpg)
Installing the battery packs
The Surveyor is equipped to handle two battery packs at a time. Both batteries are needed for using the
Carlson GPS pack.
1. Use the edge of a key or a flat point screwdriver to open the two quarter
turn latches that release the battery door from the unit.
2. Remove the battery door.
4. Insert the tab on the top of the battery door into the case slots
Close the battery door.
5. Reattach the battery door of the unit.
6. Charge the system by connecting the wall charger to the top of the data collector. A flashing red left led
light indicates the batteries are charging and a solid red light indicates a fully charged system. It is
recommended to charge the batteries overnight for 10 to 12 hours before the first use. The system
batteries should provide 4-5 hours of continuous use. A cigarette lighter Travel Charger is provided with
for field charging.
Your system comes with two External Battery pack chargers with 2 extra battery packs. The external
chargers can be connected to either the included AC Wall Chargers or the Cigarette lighter travel charger.
Please Note: When charging two battery packs in the unit the bottom battery will charge first.
The left LED light blinks while charging. When the unit is fully charged the left LED will be
solid red. The unit will not be damaged if left connected to the wall charger for extended
periods of time.
Charging temperatures
Only charge your battery pack in temperatures between 32° F and 104° F (0° C and 40° C). For
best results, charge the battery pack at room temperature (68° F or 20° C).
This document contains confidential and proprietary information that remains the property of Carlson Software Inc.
Page 3 of 7
3. Insert the battery packs so battery contacts match up (To install the
top battery pack you will need to first remove the plastic plug on the
upper battery contacts)
Carlson Software Inc.
Carlson
Software Inc.
Carlson
Carlson
Software Inc.
Software Inc.
102 West 2
Street
nd
Maysville, KY 41056
www.carlsonsw.com
www.carlsonsw.com
www.carlsonsw.com
www.carlsonsw.com
Phone: (606) 564-5028
Fax: (606) 564-6422
Updated 10/4/2010