Carmanah SpeedCheck 12 Instrukcja modernizacji - Strona 9

Przeglądaj online lub pobierz pdf Instrukcja modernizacji dla Radar Carmanah SpeedCheck 12. Carmanah SpeedCheck 12 12 stron. Ac to battery/solar

Carmanah SpeedCheck 12 Instrukcja modernizacji
4.2

Installing Solar Components (if applicable)

Battery installation should not be carried out in windy conditions. In all cases, the area at the base
of the post must be roped off to prevent people from being injured or killed by falling batteries.
The solar housing may contain additional batteries. See the SPEEDCHECK-12 manual for more
information.
1. If adding solar to this retrofit, refer to the SPEEDCHECK-12 manual for solar kit and mount installation
details. The SPEEDCHECK-12 manual can be found on the Carmanah website: support.carmanah.com.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
AC TO BATTERY/SOLAR RETROFIT GUIDE
SPEEDCHECK-12
9
|
carmanah.com