Aleo S81 sol Instrukcja instalacji - Strona 16
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Jednostka sterująca Aleo S81 sol. Aleo S81 sol 20 stron.
Również dla Aleo S81 sol: Instrukcja instalacji (20 strony)
11
For operators: maintenance
NOTE
Inspect and maintain your system to:
• Keep it safe and reliable
• Achieve top output
• Prevent damage and
• Protect your investment.
aleo solar recommends carrying out regular inspections
and maintenance so that any problems can be discovered
reliably, and rectified.
RECOMMENDATION
• aleo solar explicitly recommends annual
inspections and a more thorough inspection and
measurement every 4 years.
• We also recommend the use of a monitoring system
to identify any outages or problems quickly.
• Inspecting the output of your photovoltaic system
regularly can help to discover problems promptly,
and ensures your photovoltaic system operates at
top performance, preventing loss of output.
For the proper maintenance and repair of your aleo solar
photovoltaic system, contact your aleo solar dealer or get
in touch with aleo solar directly (see Ch. 2.2: „Contact").
11.1
Inspections
aleo solar recommends an inspection every year. This
should be a visual inspection. Refer to Ch. 11.3: „Details
for the inspections".
The inspection includes the following aspects.
11.1.1 Inspecting the generator
• Strings: condition of the insulation and mounting
• Condition of the junction box
• Condition of the visible connectors
• Condition of the earthing conductors
• for direct earthing: connection of the earthing
conductors on the frames
• for indirect earthing: connection of the frames to
the sub-structure and the earthing conductors to
the sub-structure
• Condition of the mounting system (in peripheral
area)
• Dirt on modules: type and degree of dirt
• Shade circumstances (e.g. from trees or
neighbouring houses)
Clean the components, if necessary.
Page 16/20
11.1.2 Inspecting the documentation and drawings
• Checking the module string plan
• Check the inverter's status reports
• Determine and archive the annual output
• Create and archive the inspection report.
11.2
Review
aleo solar recommends carrying out a thorough review at
least every 4 years. This includes the following work in
addition to the inspection:
• Measure the characteristics of individual strings
(MPP current I
MPP
output P
);
MPP
• Measure the insulation resistance R
• Evaluate the annual power output and compare the
data with earlier readings;
• Create and archive a review report.
Check, repair or replace components, if required. Refer to
Ch. 11.3: „Details for the inspections".
11.3
Details for the inspections
11.3.1 Mechanical inspection
■
Safety precautions
Refer to the notes in Ch. 6.2.2: „Mechanical safety precau-
tions".
■
Work steps
During the inspection, check that the mechanical connec-
tions are clean, securely fitted and properly intact.
11.3.2 Electrical inspection
■
Safety precautions
Make sure you refer to the notes in Ch. 6.2.1: „Electrical
safety precautions".
■
Work steps
During the inspection, check that the electrical connec-
tions are clean, securely fitted and properly intact.
Identify any defects or irregularities in the electrical instal-
lation and make a record of them. Then rectify the problem
as quickly as possible.
11.4
Cleaning
Depending on the ambient conditions, modules are likely to
get soiled more or less heavily over time. This can cause
reduced output.
Suggestion for external inspectors: perform a spot check to ensure that the
9
module string plan matches the installation.
According to the standard IEC 61215, a photovoltaic module should have an insulation
10
resistance of at least 40 M! • m
Some inverters provide the measured insulation resistance via an interface.
11
aleo solar GmbH | Marius-Eriksen-Straße 1 | 17291 Prenzlau | Germany | [email protected]
,
9
, open-circuit voltage U
, power
OC
,
;
10
11
IS
.
²
Quick Reference Manual Rel. 4.7, 08/2020, EN