Anderson 80G5300 Instrukcja obsługi - Strona 16

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Palnik Anderson 80G5300. Anderson 80G5300 17 stron.

13.2 Half Year Audit Record

Routine audit must be made every 6 months. Please sign the following table.
Function Audit
Flame sensor state
Air and gas pressure
Alarm signals
Igniter electrode
Control motors
Ventilate equipment
Interlock Function
Shut off cock function
Combustion air blower

13.3 Yearly Audit Record

Yearly audit list as follow but not only included
Function Audit
Leak test
Pressure switch
test
Cable and
connectors
Burner bodies
and air wings
Anderson Thermal Soluions(Suzhou)Co., Ltd
Anderson Thermal Solutions – SSA80 Operation Manual
Date
Inspector
Date
Inspector
Problem description
Problem description
14
Next Audit Time
Next Audit Time