Community HSB3-BFR22 Instrukcja obsługi - Strona 10
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Wzmacniacz Community HSB3-BFR22. Community HSB3-BFR22 12 stron. Balancepoint flyware for point source and subwoofer loudspeakers models ip8, ip6, is8, and is6, dual vertical splay with extension kit for 2-way models
HELPFUL INSTALLATION TIPS
• Assemble the horizontal arrays on the ground (or lifting surface) and then lift the entire assembly into
place. Large vertical arrays should be assembled top down - lifting each component and attaching it in
order. Smaller vertical arrays can be assembled on the ground and then flown.
• Many brackets and plates come preassembled with the 8mm flat head hardware installed. Some of the
corner brackets have differing bolt patterns and we preinstall them in the most common configuration for
that kit. Refer to the diagrams on install pages to confirm that the bolts are in the correct position for your
cabinet size.
• Assemble the array with the differing models (horn/coverage patterns) in the correct configuration.
• If the cabinets are horizontal, keep the input panels all on the same side for wiring ease, whenever
possible.
• To determine the approximate splay or array angles prior to installation, use simulation software such as
EASE®. Document those values, and set the angles on the hinges and splay brackets as they are attached
to the cabinets.
• When attaching corner brackets, thread both bolts in finger tight first, then continue to tighten equally with
hex wrenches (helps avoid misalignment issues).
• Fully tighten the connections as each assembly is finished without crushing the wood fibers.
• The U-Brackets, Vertical Yokes and Isometric Frames have hole patterns compatible with third party
manufacturers' adapter plates for 1-1/2" NPT rigid pole mounting systems (such as Chief CMA105 UL listed
Ceiling mounting systems, with a SWL rating of 500 lbs [226.7 kg]). See manufacturer's website for details.
• Contact our Technical Assistance Group (TAG) for additional guidance by phone: (610) 876-3400 or email:
GENERAL ASSEMBLY INFORMATION
The BalancePoint™ Flyware kits for the I SERIES loudspeakers are modular
and can be combined in a number of ways. The most common configuration of
each kit is shown along with instructions for assembly.
Hardware and Parts: There is a key at the beginning of each instruction that
shows the parts, their quantity and abbreviation. We also use a shortened
code for the hardware that offers an easy reference to the type, diameter and
approximate length.
ex: HW6 = Hardware Washer 6mm;
HF1-2 = Hardware, Flat head bolt, 10 x 25mm
Several parts have underside countersunk holes that are threaded for 8mm
flat head bolts. They should be fully seated (at or below the surface of the
piece) before attaching the plate/bracket to the enclosure. Bolt placement
diagrams are shown for the cabinet brackets that have multiple holes. Several
of the brackets are shipped with the 8mm flat head bolts already installed in
the most common configuration for that kit.
The loudspeaker enclosure must
have fasteners in all threaded holes
Page 10
IMPORTANT: The flat head bolts that come installed in each enclosure
must remain in place or be replaced by a threaded fastener from an array
bracket. The bolts attach to internal metal brackets that are critical to
the structural integrity and rated Safe Working Load (SWL) of each point and
each array assembly. Failure to include a fastener in every location could lead
to serious injury, or even death.
BalancePoint™ Flyware
TOOLS NEEDED FOR ASSEMBLY:
• Metric socket and ratchet set
• Metric wrench set
• Metric hex key set
Typical bolt placement
diagram for 2-way Cabinet
(angle) Bracket (PB-3)
I SERIES