andover SPINSTAND Instrukcja montażu - Strona 7

Przeglądaj online lub pobierz pdf Instrukcja montażu dla Stojaki i stojaki andover SPINSTAND. andover SPINSTAND 11 stron. Component & record rack

Assembly - Cont.
12. Slide the Middle Shelf (Item 3) over the
threaded rods making sure the edge
with the wider spacing between the
holes and edge is towards the front, just
as you did with the Top Shelf. The shelf
should be oriended with the top down.
The Record Stop should be facing down
and along the back.
13.
Slide the remaining Long Pillars (Item
Wide
6) over each rod assembly and carefully
Spacing
align each pillar in the square recess cut
in the shelf.
14. Slide the Base Shelf (Item 4) in position
over the four rods. The Label should be
facing up and towards the rear of the
shelf.
15. Place a Washer (Item 10) on each rod,
followed by a Hex Nut (Item 11 ). Snug it
up but don't tighten it.
16. Carefully align each Pillar such that they
fit securely into the mating recesses in
the shelves. Once everything is aligned,
tighten the nuts firmly using the suppled
wrench (Item 25). Hold the panel nuts
(Item 7) with the Allen Wrench (Item
19). Important: Make sure all the pillars
are correctly aligned with the square
pockets in the shelves or the stand will
be uneven.
17. Slip a spacer (Item 9) over each rod,
then screw a foot (Item 12) over each
rod and twist it finger-tight against the
spacer.
Page 8
6