2 Save Energy Owl Intuition-PV Pierwsze kroki - Strona 2
Przeglądaj online lub pobierz pdf Pierwsze kroki dla Falownik 2 Save Energy Owl Intuition-PV. 2 Save Energy Owl Intuition-PV 12 stron. Electricity consumption & solar pv generation monitoring - single phase, for homes fitted with solar pv
BEFORE YOU START
Please locate and check that you have a spare
LAN port available on the back of your broadband
Internet router. You will need to plug in the
supplied Ethernet cable. If all of the ports are in
use, you can add more connections by purchasing
an Ethernet Switch / Hub.
You will also need a spare mains socket available
close by for the supplied Plug top mains power supply.
PART NO. CMR180i
MADE IN CHINA
STEP TWO - Power up Network OWL
•
Ensure antenna is screwed, finger tight, onto brass connector on side of
the Network OWL.
•
Select UK or Euro adaptor as required. Fit to the power supply and rotate
90° until it latches into place.
•
CHECK FINGER
TIGHT
2
STEP ONE - Insert batteries into the
Transmitter
Slide back cover off of the Transmitter and insert
the batteries into the unit. Keep the Transmitter
with you alongside the Network OWL until Step
Six. You should NOT fit the Sensors at this time.
INSERT 3 x AA BATTERY
Plug the power supply into the mains and insert the DC jack
connector into the base of the Network OWL.
•
The green LED will flash rapidly. After about 30
seconds the blue LED will start a steady flash
indicating that it is in Pairing Mode.
•
Quickly move to Step Three.
PLUG IN DC POWER CONNECTOR
© 2 Save Energy Limited 2012
GREEN LED
BLUE LED