INSTALLATION
PROCEDURE
Page 10
DRI-AIR
For all Dri-Air models except ARID-X 10, AHM-1, & PDII

Electrical Connection:

Open electrical access door on the front of the electric panel
enclosure box by turning the disconnect off , loosening the
clamping screws and sliding the clamps off the door tabs.
Locate the disconnect by following the operating handle down
to the electrical panel.
Insert the incoming power cable or conduit through the hole
provided on the side of the panel enclosure box.
« use approved wire and fastening means «
Wire incoming power to the top of the disconnect as shown in
the diagrams below.
NOTE:
When 3 wire supplies are used in place of 4 wire supplies,
a control transformer is required.
3 PHASE DRYER INSTALLATION

CHECK FOR CORRECT MOTOR ROTATION

BEFORE RUNNING DRYER
To check motor rotation.......
Remove front panel to Blower Cabinet (below elec. panel box)
so the blower can be observed. Turn on the power to the dryer
and press the ON/START touch pad and then immediately
press the OFF/STOP touch pad. Observe the cooling fan on
the top of the blower motor and verify the fan is turning
clockwise. If the motor is not turning clockwise, switch any two
adjacent supply wires.

Compressed Air Connection:

Compressed air is required for ARID-X and HP4-X 150/200/
300 Floor Mount models to operate the dryer's Zone Valve.
CONNECT COMPRESSED AIR TO INLET ON DRYER SIDE
PANEL. Maximum incoming pressure not to exceed 145 psi
(1.0 mpa). The pressure gauge on the dryer is factory set to
60 psi.
The unit is now ready for operation.