AirTechnic ENERGY BOX - TO 3.500 Instrukcja montażu i konserwacji - Strona 7
Przeglądaj online lub pobierz pdf Instrukcja montażu i konserwacji dla System ogrzewania AirTechnic ENERGY BOX - TO 3.500. AirTechnic ENERGY BOX - TO 3.500 20 stron. Ceiling type heat recovery unit (aluminium plate)
INSTALLATION
Deep hood
(to prevent rainwater entering
the system)
EA ( Exhaust
OA (Outdoor
Air Inlet)
Extremely Sharp Bends
Check these warnings
before installation.
1- Install the electric heater at a distance of two times away from
duct connection diameter.
2- Connect the drainage line with downward slope.
3- Water condensed in the exchanger should be discharged by
connecting 10mm. diameter drain hose to the drain outlet
under the unit.
+30.211.70.55.500
Air Duct
Maintenance Cover
Outlet)
+30.210.22.23.283
Anchor bolt (to the provided by user)
Supply Air Grille
Bends right next
Multiple Bends
to the outlet
4- The applications which can prevent the flow of
5- The drainage line shall never be moved to an
SA
RA
(Supply Air) (Exhaust Air)
Return Air Grille
Extreme Reduction in the
diameter of the connected ducts
water in the drainage line should be avoided.
upper level than the drain pan.
7