Atlas Copco PHE 26 RA Instrukcje naprawy - Strona 6
Przeglądaj online lub pobierz pdf Instrukcje naprawy dla Wiertarka Atlas Copco PHE 26 RA. Atlas Copco PHE 26 RA 12 stron.
Removing the
1 Remove the driving tenon (1) from the
armature
armature pinion.
2 To remove the screws (4), turn the
armature until the reliefs in the fan (5)
release the screws.
3 Expel the armature (6) by hitting it lightly
with a plastic hammer.
4 Remove the sealing washer (2) and the
O-ring (3).
Removing the
1 Remove the air deflector plate (1).
field
2 Lightly hit the edge of the housing with a
plastic hammer and expel the field (3)
from the motor housing (5).
3 Remove the centering rails (2).
4 Remove the rubber shell (4).
Maintenance
General
It is recommended to regularly submit the tool to maintenance. Maintenance is also due if the carbon
brushes cut off or if the hammer mechanism fails. When carrying out maintenance all parts of the
maintenance set must be exchanged. Use the appropriate maintenance set for each machine:
PHE 26 RA 4931 3432 24 (230 V)
Cleaning
With the exception of the electrical parts all parts must be cleaned with cold cleaner. Attention! No
cleaner must enter the encapsulated bearings.
Clean the electrical parts with a dry brush.
Check the dismantled parts for abrasion (visual check) and exchange if necessary.
Abrasion test
Torque
Position
1
2
3
1
2
Name
Spindle sleeve screws
Joining gear housing/motor housing
End shield screws
Repair Instruction No. 174.3/95
1
2
1
2
Torque
6,0
Nm
2,5+5 Nm
4,0
Nm
PHE 26 RA
3
4
5
6
3
4
5
3
PAGE
6
1 6
1 7