247Blinds Plantation Shutter Instrukcja montażu - Strona 5
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Wyposażenie wnętrz 247Blinds Plantation Shutter. 247Blinds Plantation Shutter 7 stron.
Place the rest of the screws into the frame, ready to mark the screw holes once the frame is in the
right position.
4) Each panel is marked alphabetically in sequence, starting left to right. Ensure that they are
the right way up with the label on the top edge, and the slats closing upwards.
If you opted for the traditional centre tilt rod, there is a small recess the rod sits in at the
top to indicate the panel direction. If instead you've chosen the hidden rod option, there
will always be a rebate in the top rail to accommodate the closed slat.
5) Position the 1st left panel into the frame, then secure by
sliding the hinge pin in each hinge. Repeat on the other
panels working your way to the right.
6) Once done, close the panels and move the shift the frame
left to right until all of the panels line up together at the top. Use a spirit level to check.
7) Once you have done this, reposition the frame in place, and
repack if previously done so. Once done, open the panels
and mark the position of the screw holes by partially
screwing in to mark the wall. Then withdraw the screws.
8) Now remove each of the hinge pins and carefully take the
panels down. Release the top screws which have been holding the frame in place and
carefully take the frame down.
247blinds.co.uk
Reviewed 06/12/2021
Next Review: 06/12/2023