Daikin FTKS50FVM Instrukcja serwisowa - Strona 14
Przeglądaj online lub pobierz pdf Instrukcja serwisowa dla Centrale wentylacyjne Daikin FTKS50FVM. Daikin FTKS50FVM 20 stron. Removal procedure, 5.0/6.0/7.1 kw class, 15000/18000 btu/h class
Również dla Daikin FTKS50FVM: Instrukcja serwisowa (20 strony)
Swing Motors
8. Swing Motors
Warning
Step
1. Remove the swing motor
for horizontal blades.
1
Remove the screw.
2
Remove the swing
motor.
2. Remove the swing motor
for vertical blades.
1
Remove the swing shaft
on the right side.
2
Remove the 2 screws
and detach the swing
motor assembly.
3
Remove the 2 screws
and remove the swing
motor.
12
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Swing motor
Hook
Hook
(R17666)
(R2789)
(R20210)
Swing motor assembly
Swing motor
(R2792)
Si041254EE
Points
Remove the swing shaft.
(1) Unfasten the hook.
(2) Pull out the swing shaft.
(R12896)
Some models do not have
the swing motor assembly.
The swing motor assembly
has 6 hooks.
Removal Procedure