Daintree GE current Lumination LIB Instrukcja instalacji - Strona 2
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Latarnia Daintree GE current Lumination LIB. Daintree GE current Lumination LIB 4 stron. Linear in-bay lighting
Lumination® LIB
Provided Components
Mounting
Fastener
Bracket
Single Fixture Installation
1
A
Attach the mounting clips to the desired surface
in a straight line using the provided screws. The
distance between the two clips is determined
by the length of the fixture, as noted in the
chart below.
Not e: When using magnetic mounting clips, two installed
clips need to support at least 4 times the weight of the fixture
(0.5Kg per fixture).
fig. 1A
Fixture Length
Mounting Width
~300-400mm
C
Install the protective cap on
the female connector of the
fixture.
2ft
3ft
12-16in
16-24in
~400-600mm
peeling off the film
D
Remove the protective film on
the diffuser. Connect the power
cord to the male connector.
Optional Accessories
Magnetic
U-Shape
Mounting
Channel
Protective
Cap
B
Center the length of the fixture within the
installed mounting clips. Press and snap the
fixture into the mounting clips, with the male
power connector facing the power supply drop.
4ft
24-36in
~600-900mm
Installation Guide
Power Linking Cords
(4" & /1/2/6/10/12ft)
E
Plug the power cord into a
120VAC supplied outlet.
(The maximum distance to
the receptacle is determined
by the length of cord
provided.)
Power Cords
(1/2/6/10/12ft)