DSE DSE705 Instrukcja obsługi - Strona 4
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Kontroler DSE DSE705. DSE DSE705 13 stron. Ats control module
1 INTRODUCTION
The 705 is a configurable Automatic Transfer Switch control module, and is designed to work in
conjunction with generator control modules that will accept a remote start input. It monitors the
incoming AC mains supply (1 or 3 phases) for under voltage. If the voltage falls out of limits the
module will issue a start command to the generating set controller. Once the set is available and
producing an output within limits the ATS module will control the transfer devices and switch the
load from the mains to the generating set. Should the mains supply return to within limits the
module will command a return to the mains supply and shut down the generator after a suitable
cooling run. Various timing sequences are used to prevent nuisance starting and supply breaks.
Configuration is via the front panel. No other equipment such as a computer or programming lead
is required.
2 DESCRIPTION OF OPERATION
2.1 MANUAL RUN ON LOAD
To initiate a start sequence in Manual Run On Load, press the
sequence is initiated.
The start/run output is activated.
Once the unit detects the alternator frequency of 45Hz, the Warm Up timer is initiated, allowing the
engine to stabilise before accepting the load.
The load will be transferred to the generator.
The module will continue to run in this mode until another mode is selected.
If the generator should fail and the mains (utility) are available, the load is transferred back to the
mains (utility).
NOTE: - If at any time the Close To Neutral Position input is activated, the switching
device that is closed will be opened. (Load shedding). The switching device will not be re-
closed until this input is removed. All other operations are unaffected.
2.2 MANUAL RUN OFF LOAD
To initiate a start sequence in Manual Run Off Load, press the
sequence is initiated.
The start/run output is activated.
The generator will be run off load and no further action is taken.
If during this time the mains (utility) should fail, the load will be transferred to the generator.
However, the unit will NOT return the load to the mains (utility). The load will stay with the
generator until another mode is selected.
NOTE: - If at any time the Close To Neutral Position input is activated, the switching
device that is closed will be opened. (Load shedding). The switching device will not be re-
closed until this input is removed. All other operations are unaffected.
- 4 -
057-043 705 Operating Instructions Issue 1.1 18/06/2007
705 ATS controller operators manual
pushbutton, and the start
pushbutton, and the start
JR