ATTACK FD26 Instrukcja obsługi - Strona 14

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Kocioł ATTACK FD26. ATTACK FD26 16 stron. Fd series. floor standing cast-iron solid fuel burning boiler

IMPORTANT WARNING :
1. Attendance of the bboiler can be only carried out by adults familier with this instruction. To leave children without a
supervision of adults near the boiler is not allowed. Any interventions endangering the health of people attending or
aothers are not allowed.
2. If there is a danger of creating or coming of combustible vapours into the boiler room or during works when there is a
temporary danger of fire or explosion (glueing of floor coverings, painting by inflammable paints), the boiler must be put
out of the operation before startingthe works.
3. For ignition of the boiler it is FORBIDDEN to use inflammable liquids..
4. During theoperation it is FORBIDDEN to overheat the boiler..
5. No combustible objects can be put on the boiler as well as in the distance shorter than the safe one from it..
6. When taking ashes out of the boiler,there can be no combustible materials within the minimum distance of 1500 mm from
the boiler..
7. When the boiler runs with the temperature lower than 65 °C, dew formation can occur on the boiler body as well
ascorrosion that shortens the service life of the boiler body. Therefore we recommend
temperature over 65 °Cí.
8.After ending the heating season, it is necessary to clean the boiler, flues and a cowl thoroughly. Grease swivel pins, the
chimney flap and other movable parts of the boiler with graphite grease. Keep the boiler room clean and dry.Mai

16. Maintenance

1. Remove ashes from the ash collection basin during the operation even more times a day by the kind of the used fuel, because a
full ash collection basin interferes with right distribution of combustion air under fuel and causes unequal burning of fuel on the
grid. All the residuals, especially cinder, are removed before each new ignition and during restartin the boiler in the morning. Ashes
need to be put into incombustible containers with covers. During the work it is necessary to use protective aids and regard
personal safety.
2. For heating with coke, black coal and wood , clean the walls of the boiler in the grate, draughts and the cowl regularly. (with
brushes - a small brush for small holes, a brush with a handle for other superficies).
3. If after the use of some fuels with more gas released tar creates on the walls of the combustion space, remove it with a scraper or
by burning dry hard wood (or coke) with the boiler set on maximum operation temperature.
4. Measure the draught (by a service oragnization) according to the chart.
17. Directions for the liquidation of the product after its service time
As this product is made of common metal materials , we recommend to liquidate single parts in this way :
- heat exchanger (grey cast iron)
- piping, casing
- other metal parts
-insulting material
Dispose of the wrapping following these rules:
- plastic foil, cardboard wrapping and wooden palette
- metal tape
- through a company dealing with collection and liquidation of waste
- through a company dealing with collection and liquidation of waste
- through a company dealing with collection and liquidation of waste
- through a company dealing with collection and liquidation of waste
- to common waste
- to common waste
14
to run the boiler with the