3onedata ES209G-1GF Instrukcja instalacji

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przełącznik 3onedata ES209G-1GF. 3onedata ES209G-1GF 2 stron. Unmanaged ethernet switch
Również dla 3onedata ES209G-1GF: Instrukcja instalacji (2 strony)

3onedata ES209G-1GF Instrukcja instalacji
ES209G-1GF
Unmanaged Ethernet Switch Quick
Installation Guide
3onedata Co., Ltd.
Address:
3/B, Zone 1, Baiwangxin High Technology
Industrial
Park,
Xili,
Shenzhen
Website:
www.3onedata.com
Tel:
+86 0755-26702688
Fax:
+86 0755-26703485
【Package Checklist】
Please check whether the package and accessories are intact
while using the switch for the first time.
1.
Industrial Ethernet switch
3.
Quick installation guide
5.
DIN-Rail mounting attachment
If any of these items are damaged or lost, please contact our
company or dealers, we will solve it ASAP.
【Product Overview】
The product is full Gigabit unmanaged DIN-Rail Ethernet
switch. Module as follows: ES209G-1GF (8 Gigabit copper
ports + 1 Gigabit fiber ports).
【Panel Design】
Rear view, Top view and Bottom view
Front view
Nanshan
District,
2.
Certification
1.
DIN-Rail mounting kit
4.
Warranty card
2.
DIP switch
6.
Terminal
3.
Power input terminal block
blocks
4.
Grounding screw
5.
1000Base-FX Gigabit Ethernet fiber port
6.
Power supply input status indicator
7.
10/100/1000Base-T(X) Ethernet port
8.
Interface indicator
【Mounting Dimension】
Unit: mm
Attention before mounting:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging the
device.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.
【DIN-Rail Mounting】
For convenient usage in industrial environments, the product
adopts 35mm DIN-Rail mounting, mounting steps as below:
Step 1
Check if the DIN-Rail mounting kit is installed firmly.
Step 2
Insert the bottom of DIN-Rail mounting kit (one side
with spring support) into DIN-Rail, and then insert
the top into DIN-Rail.