2B Technologies UV-106W Skrócona instrukcja obsługi

Przeglądaj online lub pobierz pdf Skrócona instrukcja obsługi dla Przyrządy pomiarowe 2B Technologies UV-106W. 2B Technologies UV-106W 2 stron. Aqueous ozone monitor

2B Technologies UV-106W Skrócona instrukcja obsługi
UV-106W-Aqueous Ozone Monitor™
1) Mount the instrument upright. If there is no structure to mount the instrument to, set it on a block
on the bench-top to keep it level and provide access to the ports on the bottom.
2) Attach the electrical inputs and outputs:
a. Power (required): Use the included AC-12V DC power pack and attach it to the barrel
connector on the cable
b. Serial (optional): Attach one end of the included serial cable to the serial connector on
the cable and the other end through the USB to serial converter to a computer. Open the
desired terminal program (we recommend TeraTerm) and select the appropriate COM
port.
i. The settings on this COM port should be: 38400 baud rate, 8-bits, no parity, 1
stop bit.
c. 4-20mA (optional): The purple wire is the positive side of the 4-20mA output and the
white wire is the ground. See manual for setting the range on this output
2
B
Technologies, Inc.
Quick Start Guide