AddEnergie SmartDC Instrukcja instalacji - Strona 13

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Ładowarka AddEnergie SmartDC. AddEnergie SmartDC 15 stron. V2

Station Start-up

Before turning the station on:
1 . The electrician must ensure that the electrical installation conforms to the applicable electric code .
2 . The circuit breakers inside the charging station must be in the "ON" position .
As the station is being turned on:
1 . The electrician must verify that the station's three-phase 480Y/277V voltage is within specifications .
Once the station is on:
1 . Close and lock the charging station's casing door .
Putting the station into service:
1 . After the station has been turned on, messages will appear on the screen in front of the station, confirming that it
is now functional .
2 . The station will then attempt to communicate with the AddÉnergie servers . *To allow this communication, the
electrician must ensure that the communication gateway is installed (based on the directions in the guide) and
powered on . (reference: Gateway Installation Guide)
3 . Once the station and gateway are powered on, please communicate with the technical support of AddÉnergie to
complete the configuration: (877) 505-2674 ext . 203 .
2017 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED. Information and Specifications Contained in this Document are Subject to Change, Amendments, and Additions at any Time, Without Notice
13