AddEnergie SmartDC Instrukcja instalacji - Strona 3
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Ładowarka AddEnergie SmartDC. AddEnergie SmartDC 15 stron. V2
Security
IMPORTANT SAFETY INSTRUCTIONS-PLEASE DO NOT DISCARD THESE INSTRUCTIONS
Carefully read this guide before installing the EVSE .
1 . This station was designed to be ground-based and installed on a non combustible surface .
2 . Make sure with local authorities that the location where the EVSE is to be installed is free from
underground pipelines or electrical equipment, otherwise you might inflict yourself serious injuries .
3 . Connect the power supply of the station with copper or aluminum conductors sized in conformity
with the local code for a three-phase, 480Y/277V, 54kVA circuit, rated for usage at a maximum
temperature of at least 75°C .
4 . Grounding: to ensure the safe operation of the station, it must be connected to a grounding circuit
compliant with local regulations and installed by a certified electrician .
5 . Communicate with a certified contractor, certified electrician or trained installer to ensure compliance
with local building code, regulation, security standards and weather conditions .
6 . Any alteration of a part of the station will automatically void the warranty .
7 . Handle parts with care, since they can be sharp-edged . Always use safety glasses and gloves when
unpacking and installing .
8 . Some parts are heavy and could cause injury . Use proper lifting techniques and wear safety boots at
all times during the installation .
9 . Never insert your fingers into the electric vehicle's connector .
10 . Never use the station if the flexible power cords seem damaged, or if the insulation is damaged .
11 . Never use the station if the main case is broken, cracked, open, or damaged .
12 . This station was designed to be used with electric vehicles equipped with a CHAdeMO or SAE
J1772 Combo port .
13 . This station is to be used to charge vehicles that do not require a ventilated environment during
charging .
14 . Replacement of the station's parts must be performed by qualified service personnel .
15 . Do not install the station on or over combustible surfaces .
2017 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED. Information and Specifications Contained in this Document are Subject to Change, Amendments, and Additions at any Time, Without Notice
3